Antalogy app icon

The freedom of Markdown.
The power of Word.

Antalogy is an AI-ready desktop word processor — the familiarity of a Word interface for Markdown, the privacy of local-first, and the LLM of your choice.

A knowledge worker at a laptop surrounded by floating documents, checklists and charts.

09 November 2026:
The release of Antalogy Markdown Word Processor is officially live following its preview period!

Antalogy is now a fully featured, Word-equivalent processor for Markdown, offering seamless import and export of .docx documents—complete with styles, images, and Mermaid diagrams. It features an out-of-the-box AI Assistant that connects natively with local, corporate, and cloud-based LLMs compatible with the OpenAI API.

100% Free for to use for personal and enterprise usage!

The real benefits.

Word-like editor. For Markdown.

100% Local-first. No cloud.

  • Ribbon to format text, lists, tables.
  • Diagrams for data visualization.
  • Built-in navigation and search.
  • No document format lock-in.
  • Zero telemetry.
  • Available on Windows, macOS and Linux.
Antalogy editor window: a Word-style ribbon with font and paragraph controls, a navigation outline of document headings on the left, and a formatted Markdown document in the main pane.
A familiar ribbon and multi-window user interface — with a plain .md file underneath.
Antalogy converts .docx to .md in one-click.

Opens Word .docx.
Saves Markdown .md.
Export .md to .docx

  • One-click import of Microsoft Word (.docx).
  • Your original .docx files are never changed.
  • Formatting, lists, tables and images are preserved.
  • Embedded EMF/WMF images are converted to cross-platform PNG where possible.
  • One-click export .md to .docx with styles from Word document (select it in Settings).
  • Mermaid-diagrams are exporting to .docx as high-quality PNG.
  • Word is not needed to import and export.
  • Import/export on Windows, macOS, Linux.
Antalogy showing a table and lists in cells imported from a Word document with its structure preserved.
Antalogy showing a table and lists in cells imported from a Word document with its structure preserved.
Antalogy exports .md with embedded images and Mermaid diagrams to a .docx document on Windows, macOS and Linux.
Antalogy exports .md with embedded images and Mermaid diagrams to .docx document on Windows, macOS and Linux.

Integrated AI Assistant.

Brainstorm, edit, summarize or audit documents — without leaving your workflow.

Sync

One click, two ways.

One-click, two-way synchronization between the document — or just the selected text — and the LLM chat.

Endpoints

Your LLM, any time.

Use a local or remote LLM endpoint of your choice at any time — and switch whenever you like.

Open

OpenAI-compatible.

Compatible with any LLM that supports the OpenAI API — local, on-prem or cloud.

Air-gapped AI with local LLM.

Out-of-the-box integrations.

  • LM Studio / Bionic, Unsloth Desktop, Lemonade Server, Ollama.
  • Localhost autodiscovery for known LLMs.
  • Generic Open AI API compatible LLM harness.
  • Multiple LLM Profiles for one-click changes.
  • AI Assistant chat context per document window with one-click model selection.
  • User-friendly with no requirements for OS environment variables.
Antalogy editing a Markdown project plan with a Word-style ribbon, an AI Assistant panel generating a project stages and milestones table, and the Settings window showing local LLM engines and profiles.
Antalogy provides a Word-like editing experience for Markdown (.md), with an integrated AI Assistant connected to your local models on LM Studio / Bionic, Unsloth Desktop, Lemonade Server, Ollama and other Open AI API-compatible harnesses.

Frequently asked questions.

LLM optimization

Your intelligence, your infrastructure

Antalogy’s integrated AI Assistant chat lets you brainstorm, edit, summarize, or audit documents without leaving your workflow. Unlike locked-in cloud AI suites, you decide where the model runs:

  • Local: run quantized LLMs on your own GPU/CPU for total isolation.
  • On-prem / private cloud: connect to your private inference server, Kubernetes cluster, or enterprise LLM harness.
  • Cloud: plug into your preferred LLM provider for maximum capability.

Antalogy supports any LLM with an OpenAI-compatible API. You can switch endpoints per document, per LLM chat, or per compliance tier. The AI Assistant adapts to your security posture without changing your workflow.

Out-of-the-box support, optimization and autodiscovery for LM Studio / Bionic, Unsloth Desktop, Lemonade Server and Ollama.

Multiple LLM profiles for one-click switch in AI Assistant.

Why Markdown is the native language of AI

While .docx is engineered for print rendering, Markdown is engineered for data exchange. Its hierarchical, plain-text structure aligns perfectly with how LLMs parse, reason, and generate text.

  • Higher accuracy: clean structure reduces hallucination rates and improves formatting fidelity in AI outputs.
  • Faster inference: less overhead means quicker tokenization and response generation.
  • Future-proof archives: Markdown remains readable, editable, and interoperable across decades and platforms. No platform (OS) dependencies. No vendor lock-in. No format decay.
Estimated token consumption comparison

Switching from DOCX to Markdown cuts token waste by 31–35%, making every token count and stretching your AI budget further across documents of all sizes*:

Estimated token consumption, Markdown compared with DOCX
Document size (w/o images) Markdown tokens (lean) DOCX tokens (est. noise) Token waste (overhead) Efficiency gain
Small (~500 words) ~650~950+300 tokens~31%
Medium (~2,500 words) ~3,300~5,000+1,700 tokens~34%
Large (~10,000 words) ~13,000~20,000+7,000 tokens~35%

*Based on typical business documents containing headers, lists, tables, and standard formatting.

The context window impact

The context window is the AI’s working memory. Every token spent on XML scaffolding or hidden styling is a token stolen from your actual content.

  • DOCX impact: structural noise fills the AI’s memory faster. As documents grow, the model reaches its limit sooner and begins to “forget” early instructions, clauses, or data to accommodate later sections.
  • Markdown impact: by stripping the noise, Antalogy maximizes the effective context window. You can feed significantly more substantive content into a single prompt while ensuring the AI maintains perfect recall from the first line to the last.
Eliminating image bloat

“Image bloat” occurs when you upload a .docx file containing images directly into a Large Language Model (LLM). It wastes massive amounts of your token window and drastically increases API costs, while often degrading model performance. Because LLMs process visual information by converting images into large mathematical matrices (or high-token sequences), a single hidden or unoptimized image can consume more tokens than the entire text of a long document.

  • DOCX burden: images are embedded as binary objects wrapped in heavy metadata. AI parsers often treat this as opaque token sequences, wasting context space and increasing latency.
  • Markdown advantage: images live in Markdown documents as lightweight references, separated from the text. Antalogy’s integrated AI Assistant skips images when sending your document to the LLM, so you can freely work with Markdown documents that contain embedded images. Many kilobytes of binary overhead become a single line of text — keeping the AI focused on your words, not your file structure.

Privacy & Data Protection

No Data Collection & No Telemetry

We do not track your usage, we do not log your keystrokes, and we do not collect any personal or behavioral data. There are no tracking scripts, analytics tools, or telemetry frameworks embedded in the software. What you write, edit, or process stays strictly on your machine.

100% Local Architecture

Antalogy is compiled into a native desktop binary using Go and Wails. It does not look for, connect to, or maintain any cloud backend. Your documents (.md and .docx files) are read and written directly to your local file system. We have no servers capable of receiving or storing your documents.

Local OS Webview Execution

The user interface is powered by Svelte and rendered through your operating system's native webview engine (WebView2 on Windows and WebKit on macOS) instead of a bundled Chromium instance. This ensures the app operates isolated within your local system environment with no unauthorized internet connectivity.

Air-Gapped AI Integration (Bring Your Own LLM)

The integrated AI Assistant is entirely dormant by default. Antalogy does not route your text through any proprietary AI proxies or intermediate cloud setups. No content is ever sent to an LLM without your explicit, manual action.

  • Content exchange with LLM only occurs if you explicitly add and input your own OpenAI-compatible API keys or point the app to your own local inference server (such as LM Studio, Lemonade Server, Ollama or Unsloth Desktop). No requirements for additional environment variables for Ollama nor Unsloth as for many apps like OnlyOffice.
  • When active, you may optionally attach your open document content, selected text, or a local file to a chat message. This is done solely through dedicated buttons in the Assistant pane — nothing is attached automatically or in the background.
  • When 'Enable AI Assistant' option in Settings is checked, the application autodiscovers local LLMs and configured LLM Profiles for their availability status and communicates directly from your device to the endpoint you specified in profiles. No text, prompts, or token matrices are ever sent to us or any third party.
Open for Traffic Audits

Because we operate in complete transparency, we invite any user, engineer, or security auditor to drop Antalogy into a secure sandbox or monitor its network traffic using tools like Wireshark. As you switch off 'Enable AI Assistant' option in Settings you will find exactly zero unexpected network calls leaving your machine.

Corporate Status

Antalogy is currently developed and maintained by an independent group of software engineers in bootstrap mode. As the product transitions into a formal legal structure for enterprise utilities (such as high-volume B2B bulk conversion pipelines and OEM/White Label/Bundle licensing), this policy will remain anchored to the core principle that your standalone desktop files are yours alone.

Contact Us

For any privacy-related or technical questions, feel free to reach out directly to the engineering team at: info@antalogy.com

Local-first.
AI on your own.

Available on Windows, macOS and Linux.

Zero telemetry. No document format lock-in.